Dokumentasi / Bored Pile / Foundation
Foundation Control Tower
KPI produksi harian, Risk Radar deterministik, lookahead 3/7 hari, forecast selesai.
Untuk: PM, Site Supervisor, DirekturDiperbarui 26 Agt 2026
📷 Screenshot foundation-control belum tersedia — jalankan
php artisan docs:capture --only=foundation-control.Bagian layar
- Advanced Control Tower � klik KPI (Ready to Drill, Ready to Cast, Critical Slurry, Tremie Warning�) untuk memfilter tabel pile.
- Lookahead 3/7 hari � pile terencana + readiness snapshot + constraint aktif.
- Risk Radar � HEALTHY/WATCH/CRITICAL dari sinyal nyata: depth mismatch, overbreak, slump gagal, gap antar-truk, cage QC gagal, NCR terbuka, durasi abnormal.
Forecast Finish
Ekstrapolasi linear produktivitas 7/14 hari � tanpa AI. Label confidence mengikuti kecukupan data.